Home
Contact
ERP Login
All Industry Products
Textile & Garment Industry
Garment Manufacturing – DomesticGarment Manufacturing – ExportKnitting Management SystemDyeing Management SystemWeaving Management SystemHealthcare Industry
Hospital Management SystemFacility Management
Visitor Management SystemParking Management SystemTextile & Garment Industry
Weaving Management System
From warp beam to graded fabric.
Overview
Woven fabric production is a chain of dependent steps: warping, sizing, drawing-in and weaving. One delay on a beam stops a loom. Our Weaving Management System links all of it so loom utilisation and quality are measurable.
The problems we solve
- Beam preparation and loom allocation are planned on whiteboards.
- Warp and weft consumption doesn't reconcile with fabric produced.
- Loom downtime reasons go unrecorded.
- Fabric grading is manual, hurting traceability to the loom.
In short: Warping, sizing, beam and loom management with efficiency and fabric grading.
Key features
- Warping & sizing. Warping plans, sizing recipes and beam records with meters and ends.
- Beam & loom scheduling. Allocate beams to looms based on design and delivery date.
- Warp & weft consumption. Yarn consumption by design against fabric meters produced.
- Design & construction master. Reed, pick, ends and weave details stored per fabric variant.
- Loom-wise production. Shift-wise meters, picks and efficiency per loom.
- Downtime tracking. Stoppage reasons such as warp break, weft break or no-beam.
- Fabric inspection & grading. Four-point or grade-wise inspection with defect logs.
- Sizing & weaving job work. Handle outsourced stages with material and rate control.
How the workflow runs
A typical cycle in this solution moves through the stages below, with each hand-off recorded in ERPNext so nothing depends on memory or messages.
01
Yarn issue & warping
02
Sizing & beam creation
03
Loom allocation & weaving
04
Inspection & grading
05
Fabric stock & dispatch
ERPNext modules involved
Manufacturing · Stock · Assets · Quality · Buying · Accounts
What you can expect
- Higher loom utilisation through planned beam flow
- Warp-weft balance visible per design
- Grade-wise stock with loom traceability
- Downtime causes ranked by impact
Frequently asked questions
Do you support multiple weave designs?+
Yes. Each design is a variant with its own construction, BOM and costing.
Can we integrate loom monitoring hardware?+
Production data from loom monitors can be pushed in through API integration.
Ready for Weaving Management System?
Let's scope the modules, data migration and training your team needs.
Schedule a consultation